Total Late Work Criteria for Shop Scheduling Problems
- 1 January 2000
- conference paper
- Published by Springer Nature
- p. 354-359
Abstract
No abstract availableKeywords
This publication has 10 references indexed in Scilit:
- Scheduling Computer and Manufacturing Processes1996
- Scheduling Algorithms1995
- Single Machine Scheduling to Minimize Total Late WorkOperations Research, 1992
- Approximation algorithms for scheduling a single machine to minimize total late workOperations Research Letters, 1992
- Minimizing mean weighted execution time loss on identical and uniform processorsInformation Processing Letters, 1987
- Scheduling subject to resource constraints: classification and complexityDiscrete Applied Mathematics, 1983
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey1979
- Complexity of Machine Scheduling Problems1977
- Open Shop Scheduling to Minimize Finish TimeJournal of the ACM, 1976
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954