A note on two-stage hybrid flowshop scheduling with missing operations

Authors:
  • CTChao-Tang Tseng
    Chao-Tang Tseng
  • CLChing-Jong Liao
    Ching-Jong Liao
  • TLTai-Xiang Liao
    Tai-Xiang Liao

Abstract
No abstract available

This publication has 23 references indexed in Scilit: