A note on two-stage hybrid flowshop scheduling with missing operations
Authors:
- Chao-Tang TsengCTChao-Tang Tseng
- Ching-Jong LiaoCLChing-Jong Liao
- Tai-Xiang LiaoTLTai-Xiang Liao
- 1 April 2008
- journal article
- research article
- Published by Elsevier in Computers & Industrial Engineering
- Vol. 54 (3) , 695-704
Abstract
No abstract availableThis publication has 23 references indexed in Scilit:
- A performance evaluation of permutation vs. non-permutation schedules in a flowshopInternational Journal of Production Research, 2006
- Heuristics for scheduling in a flow shop with multiple processorsEuropean Journal of Operational Research, 1999
- A computational study of heuristics for two-stage flexible flowshopsInternational Journal of Production Research, 1996
- A composite heuristic for the identical parallel machine scheduling problem with minimum makespan objectiveComputers & Operations Research, 1994
- Schedules for a two-stage hybrid flowshop with parallel machines at the second stageInternational Journal of Production Research, 1991
- Two-Stage, Hybrid Flowshop Scheduling ProblemJournal of the Operational Research Society, 1988
- An Evaluation of Flow Shop Sequencing HeuristicsManagement Science, 1977
- Heuristic Algorithms for Multistage Flowshop Scheduling ProblemA I I E Transactions, 1972
- A Heuristic Algorithm for the n Job, m Machine Sequencing ProblemManagement Science, 1970
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954