Multiple Criteria Assessment of Pile-Columns Alternatives
- 19 September 2011
- journal article
- research article
- Published by Riga Technical University in The Baltic Journal of Road and Bridge Engineering
- Vol. 6 (3) , 145-152
Abstract
The paper presents the process of selection the pile-columns instalment alternative, which have to be the most appropriate and effective. The selection is based on a set of criteria: Mass, Cost of instalment, Labour expenditures, Machinery expenditures, Earthwork amount and Instalment tolerance. The criteria for evaluation are selected by taking into consideration the interests and goals of the client as well as factors that influence the efficiency of construction process. Their weights were determined by applying entropy method. The entropy is described as the casual value of the uncertainty which makes it more valuable in comparison with other factors. The solution of problem was made by applying Additive Ratio ASsessment (ARAS) method. The proposed technique could further be applied to substantiate the selection of effective alternative of structures, technologies, investments, etc.Keywords
This publication has 33 references indexed in Scilit:
- Application of Expert Evaluation Method to Determine the Importance of Operating Asphalt Mixing Plant Quality Criteria and Rank CorrelationThe Baltic Journal of Road and Bridge Engineering, 2011
- REGIONAL DEVELOPMENT IN LITHUANIA CONSIDERING MULTIPLE OBJECTIVES BY THE MOORA METHOD / LIETUVOS REGIONINĖS PLĖTROS DAUGIAASPEKTIS VERTINIMAS MOORA METODUTechnological and Economic Development of Economy, 2010
- An efficiency and effectiveness model for international tourist hotels in TaiwanThe Service Industries Journal, 2010
- THE ECONOMY OF THE BELGIAN REGIONS TESTED WITH MULTIMOORAJournal of Business Economics and Management, 2010
- Multiple criteria analysis of foundation instalment alternatives by applying Additive Ratio Assessment (ARAS) methodArchives of Civil and Mechanical Engineering, 2010
- MULTICRITERIA EVALUATION OF APARTMENT BLOCKS MAINTENANCE CONTRACTORS: LITHUANIAN CASE STUDYInternational Journal of Strategic Property Management, 2009
- THE ANALYSIS OF THE QUALITY OF THE RESULTS OBTAINED WITH THE METHODS OF MULTI‐CRITERIA DECISIONSTechnological and Economic Development of Economy, 2009
- RESEARCH ON THE QUALITY OF PASSENGER TRANSPORTATION BY RAILWAYTransport, 2009
- The economic crisis and efficiency change: evidence from the Korean construction industryApplied Economics, 2007
- Relative Reliability Risk Assessment Applied to Original Designs During Conceptual Design PhaseProceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 2006