Optimizing Sequential Excavation Method for Ground Settlement Control in Tehran Subway Tunnel Line 6
- 16 February 2024
- journal article
- research article
- Published by Springer Nature in Geotechnical and Geological Engineering
- Vol. 42 (5) , 3595-3614
Abstract
No abstract availableKeywords
This publication has 32 references indexed in Scilit:
- Three-Dimensional Probabilistic Analysis of the Surface Settlement Based on Spatial Variability of Soil Properties: Case Study Zarbalizadeh NATM TunnelGeotechnical and Geological Engineering, 2022
- Comparison of shallow tunneling method with pile and rib method for construction of subway station in soft groundFrontiers of Structural and Civil Engineering, 2022
- Stability Analysis and Optimal Design of Ultimate Slope of an Open Pit Mine: A Case StudyGeotechnical and Geological Engineering, 2022
- Study on Excavation Sequence of Pilot Tunnels for a Rectangular Tunnel Using Numerical Simulation and Field Monitoring MethodRock Mechanics and Rock Engineering, 2022
- Stress/strain variability in fractured media: a fracture geometric studyGeotechnical and Geological Engineering, 2021
- Influence of Forepoling Umbrella on the Settlements Induced by Shallow Urban TunnelingGeotechnical and Geological Engineering, 2020
- Numerical Modeling on Localized Ground Subsidence Induced by the Tunneling in Sand2018
- Numerical analysis on the mechanical performance of supporting structures and ground settlement characteristics in construction process of subway station built by Pile-Beam-Arch methodKSCE Journal of Civil Engineering, 2016
- Feasibility of PSO-ANN model for predicting surface settlement caused by tunnelingEngineering with Computers, 2016
- Investigation of ground surface settlement in twin tunnels driven with EPBM in urban areaArabian Journal of Geosciences, 2014