Scheduling learning dependent jobs in customised assembly lines
- 9 December 2009
- journal article
- research article
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 48 (22) , 6683-6699
Abstract
The large variety of product models required by customised markets implies lot size reduction. This strongly affects manual-based production activities, since workers need to promptly adapt to the specifications of the next model to be produced. Completion times of manual-based activities tend to be highly variable among workers, and are difficult to estimate. This affects the scheduling of those activities since scheduling precision depends on reliable estimates of job completion times. This paper presents a method that combines learning curves and job scheduling heuristics aimed at minimising the total weighted earliness and tardiness. Workers performance data is collected and modelled using learning curves, enabling a better estimation of the completion time of jobs with different size and complexity. Estimated completion times are then inputted in new scheduling heuristics for unrelated parallel workers, equivalent to machines in this study, created by modifying heuristics available in the literature. Performance of the proposed heuristics is assessed analysing the difference between the optimal schedule objective function value and that obtained using the heuristics, as well as the workload imbalance among workers. Some contributions in this paper are: (i) use of learning curves to estimate completion times of jobs with different sizes and complexities from different teams of workers; and (ii) use of a more complex scheduling objective function, namely the total weighted earliness and tardiness, as opposed to most of the developments in the current scheduling literature. A shoe manufacturing application illustrates the developments in the paper.Keywords
This publication has 23 references indexed in Scilit:
- Learning curve modelling of work assignment in mass customized assembly linesInternational Journal of Production Research, 2007
- Total tardiness minimization on unrelated parallel machine scheduling with auxiliary equipment constraintsOmega, 2006
- Mass customization: Literature review and research directionsInternational Journal of Production Economics, 2001
- Heuristic algorithms for unrelated parallel machine scheduling with a common due date, release dates, and linear earliness and tardiness penaltiesMathematical and Computer Modelling, 2001
- Single-machine scheduling with learning considerationsEuropean Journal of Operational Research, 1999
- Scheduling under a common due-data on parallel unrelated machinesEuropean Journal of Operational Research, 1998
- The impact of learning rate and constraints on production line performanceInternational Journal of Production Research, 1995
- Computational survey of univariate and multivariate learning curve modelsIEEE Transactions on Engineering Management, 1992
- Applied Multivariate Data Analysis1992
- A state-of-the-art review of parallel-machine scheduling researchEuropean Journal of Operational Research, 1990