Deadline-Aware Coflow Scheduling in a DAG
Authors:
- Junchao WangJWJunchao Wang
- Huan ZhouHZHuan Zhou
- Yang HuYHYang Hu
- Cees De LaatCLCees De Laat
- Zhiming ZhaoZZZhiming Zhao
- 1 December 2017
- conference paper
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 341-346
Abstract
Data-intensive applications usually need to deal with huge volumes of data within their deadlines. These applications can be modelled as DAGs and require parallel computation frameworks such as MapReduce and Spark to enhance the performance. The network communication has a crucial impact on the performance of an application. Coflow is intended to address the application-specific network level Quality-of-Service (QoS) requirements in cloud-based data centres. However, existing works mainly focus on scheduling coflows in a single stage. How to schedule coflows in multi-stage applications (represented as DAGs) remains to be an open problem. In this paper we study the problem of scheduling coflows in a DAG to meet its deadline requirement. Single stage coflow scheduling has been proven to be NP-hard. Multiple stages in a DAG make our problem even more complex. Owing to the complexity of the problem, we propose a genetic algorithm-based method for solving the problem. The effectiveness of our solution is verified through numerical evaluation. Experimental results show that our solution can effectively guarantee the deadline of the DAGs compared with existing single stage coflow scheduling algorithms.Keywords
This publication has 23 references indexed in Scilit:
- SDN-aware federation of distributed dataFuture Generation Computer Systems, 2016
- Efficient Coflow Scheduling Without Prior Knowledge2015
- Minimizing the Total Weighted Completion Time of Coflows in Datacenter Networks2015
- A New Approach to the Cloud-Based Heterogeneous MapReduce Placement ProblemIEEE Transactions on Services Computing, 2015
- Developing and Operating Time Critical Applications in Clouds: The State of the Art and the SWITCH ApproachProcedia Computer Science, 2015
- Hybrid Scheduling Algorithm in Early Warning SystemsProcedia Computer Science, 2014
- Coflow2012
- Network Resource Control for Data Intensive Applications in Heterogeneous Infrastructures2012
- Random graph generation for scheduling simulations2010
- Distributed execution of aggregated multi domain workflows using an agent framework2007