Bridge user cost estimation – a synthesis of existing methods and addressing the issues of multiple counting, workzones and traffic capacity limitation
Authors:
- 1 September 2013
- journal article
- research article
- Published by Taylor & Francis in Structure and Infrastructure Engineering
- Vol. 9 (9) , 849-859
Abstract
Efforts to incorporate the concerns of bridge users in bridge investment evaluation are often stymied by lack of a comprehensive framework for assessing different user costs. There is a need to synthesise and update existing user cost estimation techniques so that the incorporation of user costs in bridge investment evaluation can be more consistent and streamlined. Secondly, a bridge detour may occur for more than one reason, thus there is a danger of multiple counting that could cause overestimation of user costs. Thirdly, user costs during bridge workzones have rarely been considered in the literature. To address these issues, this article presents a framework for comprehensive estimation of bridge user costs, an approach to address the multiple-counting problem, and a methodology for bridge workzone user cost estimation. Furthermore, the article develops a method to estimate bridge user delay cost due to traffic capacity limitation. The methodologies are demonstrated using a case study.Keywords
This publication has 5 references indexed in Scilit:
- Updating and Enhancing the Indiana Bridge Management System (IBMS)2009
- Florida DOT Project-Level Bridge Management ModelsJournal of Bridge Engineering, 2003
- User Cost Model for Bridge Management SystemsTransportation Research Record: Journal of the Transportation Research Board, 2000
- Methodology to Estimate User Costs in Indiana Bridge Management SystemTransportation Research Record: Journal of the Transportation Research Board, 1997
- The Development of Optimal Strategies for Maintenance, Rehabilitation, and Replacement of Highway Bridges: Volume 4 - Cost Analysis : Executive Summary and Final Report1989