Development of a regression-based method with case-based tuning to solve the due date assignment problem
Authors:
- 1 January 2007
- journal article
- research article
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 45 (1) , 65-82
Abstract
Many regression-based methods to date have been proposed for solving the due date assignment (DDA) problem. The advantages of regression-based DDA methods are that they are easy to both put into practice and comprehend. However, relatively little scheduling research has focused on improving the performances of regression-based DDA methods. The performance of a regression-based DDA method could be improved if its values of regression coefficients could provide a more accurate and precise flowtime estimation for each individual job. The difficulty in doing this stems from the dynamic and stochastic nature of production environment that precludes accurate estimation. Therefore, the aim of this study is to suggest a particular methodology for setting the regression coefficients to improve the performance of regression-based DDA method. In particular, the regression-based DDA method achieved by our suggested methodology is able to adjust the values of coefficients dynamically to best predict the job due date based on the condition of the shop at the instant of job entry. To evaluate the robustness of the methodology, an experimental design was used with four regression coefficient determining procedures, two shop models, and three dispatching rules. The results of this investigation clearly indicate that significant improvements in the performance of regression-based DDA method can occur when the suggested methodology is used.Keywords
This publication has 23 references indexed in Scilit:
- Due date assignment using artificial neural networks under different shop floor control strategiesInternational Journal of Production Research, 2004
- A bottleneck-based due-date assignment methodologyInternational Journal of Manufacturing Technology and Management, 2000
- Job shop scheduling for missed due-date performanceComputers & Industrial Engineering, 1998
- Due-date based scheduling and control policies in a multiproduct semiconductor wafer fabrication facilityIEEE Transactions on Semiconductor Manufacturing, 1998
- Integrating order release control with due-date assignment rulesInternational Journal of Production Research, 1997
- Using Neural Networks to Determine Internally‐Set Due‐Date Assignments for Shop Scheduling*Decision Sciences, 1994
- Job shop flowtime prediction and tardiness control using queueing analysisInternational Journal of Production Research, 1993
- Neural networks applications in manufacturing processesComputers & Industrial Engineering, 1992
- Dynamic rules for due-date assignmentInternational Journal of Production Research, 1991
- Scheduling semiconductor wafer fabricationIEEE Transactions on Semiconductor Manufacturing, 1988