The IRR, NPV and the Fallacy of the Reinvestment Rate Assumptions
Author:
- 1 January 1988
- journal article
- research article
- Published by Taylor & Francis in The Engineering Economist
- Vol. 33 (4) , 303-330
Abstract
The Internal Rate of Return and Net Present Value decision criteria are probably the most well known economic decision criteria: they are also probably the most misunderstood. The ‘reinvestment rate assumptions’ attributed by some writers are two such misconceptions and they appear to be the result of a misunderstanding of two fundamental principles of economic decision making: an economic decision should be (1) based on the prospective differences in the (2) real (out-of-pocket) monetary consequences. This paper illustrates the fallacy of the ‘reinvestment rate assumptions’ numerically, mathematically, and intuitively.Keywords
This publication has 14 references indexed in Scilit:
- ERRORS IN PRESENT WORTH EVALUATIONS ATTRIBUTABLE TO THE END-OF-YEAR AND MID-YEAR CASH FLOW CONVENTIONSThe Engineering Economist, 1984
- Capital Budgeting: Theory and PracticeThe Engineering Economist, 1984
- Discounted Cash Flow Reinvestment Rate AssumptionsThe Engineering Economist, 1984
- A Decision Procedure for Capital Rationing Investment and Borrowing DecisionsThe Engineering Economist, 1980
- ‘Modified’ Rates of Return for Investment Project Evaluation—A Comparison and CritiqueThe Engineering Economist, 1979
- A review of: “ THE MODIFIED INTERNAL RATE OF RETURN AND INVESTMENT CRITERION ”, A REPLYThe Engineering Economist, 1977
- The Modified Internal Rate of Return and Investment CriterionThe Engineering Economist, 1976
- A Note on Reinvestment Assumptions in Choosing between Net Present Value and Internal Rate of ReturnThe Journal of Finance, 1972
- The Prospective Growth Rate as a Measure of Acceptability of a ProposalThe Engineering Economist, 1970
- Three Problems in Rationing CapitalThe Journal of Business, 1955