Reliability-aware multi-objective resource scheduling of shield tunnel projects under stochastic equipment failures and maintenance uncertainty
Authors:
- Huiping ZhangHZHuiping Zhang
- Guangyuan LiuGLGuangyuan Liu
- Runqi LiRLRunqi Li
- Bright LiuBLBright Liu
- Qingguang HuangQHQingguang Huang
- Siyong ZhangSZSiyong Zhang
- Guizhen LiuGLGuizhen Liu
- Hongtao ZhuHZHongtao Zhu
- Dun LiuDLDun Liu
- Sai MaSai Ma
- 23 October 2026
- journal article
- Published by Elsevier in Reliability Engineering & System Safety
- Vol. 278
Abstract
No abstract availableThis publication has 50 references indexed in Scilit:
- A hybrid NSGA-III and Q-learning algorithm for multi-mode and multi-objective resource constrained project scheduling considering two-layered stochastic inputsApplied Soft Computing, 2026
- A hybrid NSGA-II and delayed local search approach for home healthcare scheduling and routing optimizationApplied Soft Computing, 2026
- Simulation-based approaches for construction resource management: methods, challenges, and future directionsAdvanced Engineering Informatics, 2025
- Advances in artificial intelligence and digital twin for tunnel boring machinesArtificial Intelligence Review, 2025
- A priority rule heuristic for the multi-skilled resource-constrained project scheduling problemApplied Soft Computing, 2025
- Integrated optimization of stochastic resource scheduling and machine maintenance in prefabricated component production processesAutomation in Construction, 2023
- Extensions of the resource-constrained project scheduling problemAutomation in Construction, 2023
- Multi-objective optimal scheduling of automated construction equipment using non-dominated sorting genetic algorithm (NSGA-III)Automation in Construction, 2022
- A soft computing approach based on critical chain for project planning and control in real-world applications with interval dataApplied Soft Computing, 2021
- Project scheduling with flexible resources: formulation and inequalitiesOR Spectrum, 2010