IsoDAR@Yemilab: Preliminary Design Report -- Volume II: Medium Energy Beam Transport, Neutrino Source, and Shielding
Preprint
Abstract
This Preliminary Design Report (PDR) describes the IsoDAR electron-antineutrino source in two volumes which are mostly site-independent and describe the cyclotron driver providing a 60 MeV, 10 mA proton beam (Volume I); and the medium energy beam transport line (MEBT) and target (this Volume). The IsoDAR driver and target will produce about $1.15\cdot10^{23}$ electron-antineutrinos over five calendar years. Paired with a kton-scale liquid scintillator detector, this will enable a broad particle physics program including searches for new symmetries, new interactions and new particles. Here in Volume II, we describe the medium energy beam transport line, the antineutrino source beam-target and surrounding sleeve, shielding, and plans for monitoring and installation.
Keywords
All Related Versions
This publication has 20 references indexed in Scilit:
- Neutrino yield and neutron shielding calculations for a high-power target installed in an underground settingJournal of Instrumentation, 2026
- Yemilab, a new underground laboratory in KoreaAAPPS Bulletin, 2024
- Review of Particle PhysicsPhysical Review D, 2024
- Analyzing beam-gas interactions in an H2+ cyclotron beamJournal of Physics G: Nuclear and Particle Physics, 2023
- Critical Heat Flux (CHF) Correlations for Subcooled Water Flow Boiling at High Pressure and High Heat FluxJournal of Thermal Science, 2021
- The shielding design concept for the ISODAR neutrino targetJournal of Instrumentation, 2020
- Optimizing the 8Li yield for the IsoDAR Neutrino ExperimentJournal of Instrumentation, 2019
- Modern Nuclear Data Evaluation with the TALYS Code SystemNuclear Data Sheets, 2012
- Target Performance at the Low Energy Neutron SourcePhysics Procedia, 2012
- Heat transfer at the phase interface of bubbles collapsing in subcooled liquids and during subcooled boilingHeat and Mass Transfer, 2006