Controlled Intervention: Monitoring the Dismantlement and Reconstruction of the Flying Buttresses of Two Gothic Churches
- 1 November 2012
- journal article
- research article
- Published by Taylor & Francis in International Journal of Architectural Heritage
- Vol. 6 (6) , 689-708
Abstract
This study on controlled intervention focuses on the interest of monitoring during structural interventions on historical constructions. In addition to being a mechanism for control or validation of the intervention, in some cases, an adequate monitoring system can be a prerequisite for the execution of complex structural interventions. In this contribution, the methodology of controlled intervention is applied on the dismantlement and reconstruction of flying buttresses and illustrated with two case studies. In one case, the St. James Church in Leuven, the monitoring process governs the intervention. For the other case, the Church of Our Lady in Laken, monitoring data are used to control and validate the design of the intervention measures. In both cases, thanks to the monitoring systems, the dismantlement was controlled in real-time and the disturbance to the structure could be kept to a minimum.Keywords
This publication has 6 references indexed in Scilit:
- Three-Dimensional Analysis of Masonry Vaults Using Limit State Analysis with Finite FrictionInternational Journal of Architectural Heritage, 2011
- Masonry Arches: Historical Rules and Modern MechanicsInternational Journal of Architectural Heritage, 2007
- Church of Saint-James at Leuven: Structural Assessment and Consolidation MeasuresInternational Journal of Architectural Heritage, 2007
- Stabilising the leaning tower of PisaBulletin of Engineering Geology and the Environment, 1998
- Advantages and Limitations of the Observational Method in Applied Soil MechanicsGéotechnique, 1969
- The safety of masonry archesInternational Journal of Mechanical Sciences, 1969