Innovative ESP Completions for Liverpool Bay Development

Authors:

Abstract
Summary: This paper presents a review of the electrical-submersible-pump (ESP) completions installed in the Douglas field in Liverpool Bay-A number of innovations were introduced into the completion design successfully. These are discussed, along with the completion procedures and the excellent operational performance that was achieved during initial completions. ESP-runlife performance and the steps taken to maximize runlives are also discussed.