Risk Evaluation of Water Environmental Treatment PPP Projects Based on the Intuitionistic Fuzzy MULTIMOORA Improved FMEA Method
Open Access
Abstract
The water environment treatment public-private partnership (PPP) project has a long cooperation period, large investment scale, high technical requirements, and more complex risks, which are very important to identifying and preventing risks. This paper establishes a risk evaluation model for water environmental treatment PPP projects based on the intuitionistic fuzzy Multi-Objective Optimization on the basis of a Ratio Analysis plus the full Multiplicative form (MULTIMOORA) improved Failure Mode and Effects Analysis (FMEA) method. Firstly, the risk indicators system of the water environmental treatment PPP project was constructed through the literature frequency statistics method and semi-structured interviews. Subsequently, the intuitionistic fuzzy FMEA method was used to assess the risk factors in terms of three aspects—occurrence(O), severity(S), and non-detectability(D)—and gather expert information, and the expert assessment method and deviation maximization model method were applied to assign the risk factors. Finally, Intuitionistic fuzzy Multi-Objective Optimization on the basis of a Ratio Analysis plus the full Multiplicative form (IF-MULTIMOORA) was applied to determine the risk indicator ranking and was combined with the water environmental treatment PPP project in Pingyu for example verification. The results show that the top five risk levels of PPP projects in Pingyu water environmental treatment are financing risk (changing financing conditions/high costs), market changes, government intervention and credit problems, imperfect legal and regulatory systems, and inflation. The risk assessment model proposed in this paper enables: (1) the evaluation of risk indicators from three perspectives, which is more accurate and comprehensive; (2) the introduction of intuitionistic fuzzy risk factor language variables to reasonably represent expert views; (3) the use of IF-MULTIMOORA for risk ranking to avoid the problem that RNP is the same and difficult to rank. This paper has important practical significance in promoting risk prevention and achieving the sustainable development of water environment treatment PPP projects.Keywords
Funding Information
- National Natural Science Foundation of China (72271091, 71974056)
- Henan Science and Technology Project (212102310392)
This publication has 52 references indexed in Scilit:
- Risk evaluation approaches in failure mode and effects analysis: A literature reviewExpert Systems with Applications, 2013
- Fuzzy assessment of FMEA for rotary switches: a case studyThe TQM Journal, 2012
- Critical factors and risk allocation for PPP policy: Comparison between HSR and general infrastructure projectsTransport Policy, 2012
- IDENTIFICATION AND ALLOCATION OF RISKS ASSOCIATED WITH PPP WATER PROJECTS IN CHINA / SU KINIJOS VANDENS PROJEKTAIS, PAGRĮSTAIS VIEŠOJO IR PRIVAČIOJO SEKTORIŲ PARTNERYSTE, SUSIJUSIŲ RIZIKOS RŪŠIŲ NUSTATYMAS IR PASKIRSTYMASInternational Journal of Strategic Property Management, 2011
- Empirical Study of Risk Assessment and Allocation of Public-Private Partnership Projects in ChinaJournal of Management in Engineering, 2011
- An integrated risk management system (IRMS) for PPP projectsJournal of Financial Management of Property and Construction, 2010
- PROJECT MANAGEMENT BY MULTIMOORA AS AN INSTRUMENT FOR TRANSITION ECONOMIES / PROJEKTŲ VADYBA SU MULTIMOORA KAIP PRIEMONĖ PEREINAMOJO LAIKOTARPIO ŪKIAMSTechnological and Economic Development of Economy, 2010
- An Evolutionary Dynamical Analysis of Multi-Agent Learning in Iterated GamesAutonomous Agents and Multi-Agent Systems, 2005
- Risk management framework for construction projects in developing countriesConstruction Management and Economics, 2004
- Fuzzy logic prioritization of failures in a system failure mode, effects and criticality analysisReliability Engineering & System Safety, 1995