Loading of Substation Electrical Equipment with Emphasis on Thermal Capability Part II-Application
Authors:
- 1 July 1979
- journal article
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Apparatus and Systems
- Vol. PAS-98 (4) , 1403-1419
Abstract
The methodology for establishing thermal loading capability of substation electrical equipment and material should recognize system loading and ambient weather conditions in addition to the unit thermal parameters. Application of a recently developed methodology may show significant potential economic benefits, improved utilization of substation plant investment and satisfactory service performance and equipment maintenance requirements.Keywords
This publication has 4 references indexed in Scilit:
- A new thermal rating approach: The real time thermal rating system for strategic overhead conductor transmission lines -- Part II: Steady state thermal rating programIEEE Transactions on Power Apparatus and Systems, 1977
- A new thermal rating approach: The real time thermal rating system for strategic overhead conductor transmission lines -- Part I: General description and justification of the real time thermal rating systemIEEE Transactions on Power Apparatus and Systems, 1977
- Determination of Disconnecting Switch Ratings for the Pennsylvania-New Jersey-Maryland InterconnectionIEEE Transactions on Power Apparatus and Systems, 1972
- The calculation of the temperature rise and load capability of cable systemsTransactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems, 1957