Assembly block storage location assignment at a shipyard: a case of Hyundai Heavy Industries
Authors:
- 22 March 2007
- journal article
- research article
- Published by Taylor & Francis in Production Planning & Control
- Vol. 18 (3) , 180-189
Abstract
It is not a trivial issue how to manage assembly blocks at a shipyard. Based on the project experience in Hyundai Heavy Industries, currently the largest shipbuilding company in the world and the leader in the Korean merchant shipbuilding industry, this study points out the difficulties on the block stockyard operations, formalises the assembly block storage location assignment problem, and develops the assembly block storage location assignment algorithm, the purpose of which is to reduce the number of unproductive block moves. Through simulation experiments for various situations, this study demonstrates the usefulness of the assembly block storage location assignment algorithm. In addition, this study examines the impacts of block move sequence rules and of block stockyard layouts on the block stockyard operations.Keywords
This publication has 6 references indexed in Scilit:
- Steel stock management on the stockyard operations in shipbuilding: a case of Hyundai Heavy IndustriesProduction Planning & Control, 2006
- A decision support system for operations in a container terminalDecision Support Systems, 2005
- Storage space allocation in container terminalsTransportation Research Part B: Methodological, 2003
- An approach to determine storage locations of containers at seaport terminalsComputers & Operations Research, 2001
- Travel time analysis for general item location assignment in a rectangular warehouseEuropean Journal of Operational Research, 1999
- Storage location assignment: Using the product structure to reduce order picking timesInternational Journal of Production Economics, 1996