Quantifying weather impact on formwork shuttering and removal operation using system dynamics
Open Access
- 1 May 2013
- journal article
- research article
- Published by Elsevier in KSCE Journal of Civil Engineering
- Vol. 17 (4) , 620-626
Abstract
No abstract availableKeywords
This publication has 15 references indexed in Scilit:
- Factors Affecting Engineering ProductivityJournal of Management in Engineering, 2011
- Integrated Framework for Quantifying and Predicting Weather-Related Highway Construction DelaysJournal of Construction Engineering and Management, 2010
- Modeling Microtunneling Projects using Computer SimulationJournal of Construction Engineering and Management, 2010
- Special-Purpose Simulation Model for Balanced Cantilever BridgesJournal of Bridge Engineering, 2008
- Simulation of Concrete Paving Operations on Interstate-74Journal of Construction Engineering and Management, 2008
- A simulation model using system dynamic method for construction and demolition waste management in Hong KongConstruction Innovation, 2007
- Web-Enabled System Dynamics Model for Error and Change Management on Concurrent Design and Construction ProjectsJournal of Computing in Civil Engineering, 2006
- Benchmarking of Construction ProductivityJournal of Construction Engineering and Management, 2005
- Impact of Rainfall on the Productivity of Highway ConstructionJournal of Construction Engineering and Management, 2001
- Computer‐Aided Project Duration Forecasting Subjected to the Impact of RainComputer-Aided Civil and Infrastructure Engineering, 2000