Optimal scheduling model to minimize tritium inventory level in fuel cycle of tritium plant
Authors:
- Suh-Young LeeSLSuh-Young Lee
- Min Ho ChangMCMin Ho Chang
- Sei-Hun YunSYSei-Hun Yun
- Jin-Kuk HaJHJin-Kuk Ha
- In-Beum LeeILIn-Beum Lee
- Euy Soo LeeELEuy Soo Lee
- 1 November 2018
- journal article
- conference paper
- Published by Elsevier in Fusion Engineering and Design
- Vol. 136, 747-751
Abstract
No abstract availableKeywords
Funding Information
- ITER Technology R&D Program
- National Fusion Research Institute (NFRI) of Korea
- Korean government
This publication has 8 references indexed in Scilit:
- Hypothetical operation model for the multi-bed system of the Tritium plant based on the scheduling approachFusion Engineering and Design, 2016
- Alternative analysis for fuel storage and delivery in the ITER Tritium PlantFusion Engineering and Design, 2014
- Recent analysis of key plasma wall interactions issues for ITERJournal of Nuclear Materials, 2009
- New General Continuous-Time State−Task Network Formulation for Short-Term Scheduling of Multipurpose Batch PlantsIndustrial & Engineering Chemistry Research, 2003
- The tritium fuel cycle of ITER-FEATFusion Engineering and Design, 2001
- Time-dependent tritium inventories and flow rates in fuel cycle components of a tokamak fusion reactorFusion Engineering and Design, 1995
- A general algorithm for short-term scheduling of batch operations—I. MILP formulationComputers & Chemical Engineering, 1993
- Deuterium-Tritium Fuel Self-Sufficiency in Fusion ReactorsFusion Technology, 1986