Integrated production planning and control system for a panelized home prefabrication facility using simulation and RFID
Authors:
- Mohammed Sadiq AltafMAMohammed Sadiq Altaf
- Ahmed BoufergueneABAhmed Bouferguene
- Hexu LiuHexu Liu
- Mohamed Al-HusseinMAMohamed Al-Hussein
- Haitao YuHYHaitao Yu
- 1 January 2018
- journal article
- research article
- Published by Elsevier in Automation in Construction
- Vol. 85, 369-383
Abstract
No abstract availableKeywords
Funding Information
- Natural Sciences and Engineering Research Council of Canada (IRCPJ 419145-15)
This publication has 26 references indexed in Scilit:
- Optimized flowshop scheduling of multiple production lines for precast productionAutomation in Construction, 2016
- Building information modeling and discrete event simulation: Towards an integrated frameworkAutomation in Construction, 2014
- Panel Stacking, Panel Sequencing, and Stack Locating in Residential Construction: Lean ApproachJournal of Construction Engineering and Management, 2012
- The development of a lean park homes production process using process flow and simulation methodsJournal of Manufacturing Technology Management, 2012
- Lean Homebuilding: Lessons Learned from a Precast Concrete PanelizerJournal of Architectural Engineering, 2011
- Internal relationship modeling and production planning optimization for the manufactured housingAutomation in Construction, 2011
- Applications of particle swarm optimisation in integrated process planning and schedulingRobotics and Computer-Integrated Manufacturing, 2009
- A generalised framework for simulation-based decision support for manufacturingProduction Planning & Control, 2008
- A particle swarm optimization algorithm for makespan and total flowtime minimization in the permutation flowshop sequencing problemEuropean Journal of Operational Research, 2007
- Production Process for Manufactured HousingJournal of Construction Engineering and Management, 2004