Abstract
This paper tends to analyze one critical area “pyro system” in cement production process where energy is been lose and ways on how some of these energies can be recovered back into the system and also analyzing the cost benefits. This led to the modeling of a clinker cooler known as “test rig”. This model was used to study the operating system of the existing running plant. The test rig was designed using SolidWorks Computer Aided Design software based on the geometrical dimensions adopted into the test rig design. The test rig was scaled down to a ratio 25:1, with the existing clinker cooler been twenty-five and the test rig is one. The clinker cooler bed height varies from 0.3, 0.4 and 0.6 m. The quantities of energy transfer are dependent upon the optima clinker bed height (0.6 m) which resulted into improved clinker outlet of 76.4°C. A cost benefits on recovery energy efficiency on the existing running plants can be translated to a financial gain of $12,092 by improving the clinker bed height from 0.45 m to 0.6 m with expected clinker output in 24 h is 6,000 tons/day. Key words: Bed height, mass flow, energy recovery, energy efficiency, test rig and cost benefits. This paper tends to analyze one critical area “pyro system” in cement production process where energy is been lose and ways on how some of these energies can be recovered back into the system and also analyzing the cost benefits. This led to the modeling of a clinker cooler known as “test rig”. This model was used to study the operating system of the existing running plant. The test rig was designed using SolidWorks Computer Aided Design software based on the geometrical dimensions adopted into the test rig design. The test rig was scaled down to a ratio 25:1, with the existing clinker cooler been twenty-five and the test rig is one. The clinker cooler bed height varies from 0.3, 0.4 and 0.6 m. The quantities of energy transfer are dependent upon the optima clinker bed height (0.6 m) which resulted into improved clinker outlet of 76.4°C. A cost benefits on recovery energy efficiency on the existing running plants can be translated to a financial gain of $12,092 by improving the clinker bed height from 0.45 m to 0.6 m with expected clinker output in 24 h is 6,000 tons/day. Key words: Bed height, mass flow, energy recovery, energy efficiency, test rig and cost benefits.Keywords
This publication has 13 references indexed in Scilit:
- Agglomeration in Stripper Ash Coolers and Its Possible Remedial Solutions: a Case StudyJournal of The Institution of Engineers (India): Series C, 2016
- Energetic and exergetic analysis of waste heat recovery systems in the cement industryEnergy, 2013
- Analysis of Energy-Efficiency Opportunities for the Cement Industry in Shandong Province, China2009
- Energetic and exergetic assessment of a trass mill process in a cement plantEnergy Conversion and Management, 2009
- Investigation of effect of varying dead-state temperatures on energy and exergy efficiencies of a Raw Mill process in a cement plantInternational Journal of Exergy, 2009
- Energy and exergy analysis at the utility and commercial sectors of MalaysiaEnergy Policy, 2007
- Assessment of the thermal performance and energy conservation opportunities of a cement industry in IndonesiaApplied Thermal Engineering, 2005
- Energy and exergy use in public and private sector of Saudi ArabiaEnergy Policy, 2004
- CARBON DIOXIDE EMISSIONS FROM THE GLOBAL CEMENT INDUSTRYAnnual Review of Energy and the Environment, 2001