Increase in wind load during assembly causes collapse of the hall structure
Authors:
- Rajmund L. IgnatowiczRIRajmund L. Ignatowicz
- Jan GierczakJGJan Gierczak
- 1 July 2020
- journal article
- research article
- Published by Elsevier in Engineering Failure Analysis
- Vol. 113
Abstract
No abstract availableKeywords
This publication has 9 references indexed in Scilit:
- Failure analysis of transmission tower subjected to strong wind loadJournal of Constructional Steel Research, 2019
- Failure analysis of steel silos subject to wind loadEngineering Failure Analysis, 2017
- Disaster of an industrial hall caused by an explosion of wood dust and fireEngineering Failure Analysis, 2015
- Collapse of halls made from cold-formed steel sheetsEngineering Failure Analysis, 2013
- Failure state of steel roof structure of the show-sports hall during assemblyArchives of Civil and Mechanical Engineering, 2012
- Failure analysis on collapsed towers of overhead electrical lines in the region Münsterland (Germany) 2005Engineering Failure Analysis, 2011
- Failure hazard and strengthening of roof in steel industrial building after explosion of electric furnaceEngineering Failure Analysis, 2009
- Wind Loading on Tall BuildingsElectronic Journal of Structural Engineering, 2007
- The relationship of reliability to wind loadingJournal of Wind Engineering and Industrial Aerodynamics, 1983