Slippage Failure of a New Hot-Mix Asphalt Overlay
Author:
- 1 June 2010
- journal article
- Published by American Society of Civil Engineers (ASCE) in Journal of Performance of Constructed Facilities
- Vol. 24 (3) , 258-264
Abstract
A premature pavement overlay failure had occurred only 1 day after it was opened to traffic. Crescent-shaped cracks were intermittently spread over a section about 3 mi in length. Dynamic cone penetrometer results demonstrated that the slippage cracks were not linked to weak base or subgrade. Loss of overlays on structurally sound pavements due to poor bonding is an expensive error. A tack coat is considered a simple, relatively inexpensive, yet essential step in the pavement construction process. It is theorized that the ineffective bonding due to poor quality tack coat and/or inappropriate application rate is the primary factor that led to the slippage cracks. Other contributing factors include low asphalt content and high aging ratio that reduced the effectiveness of the bond. The aging ratios exceed the maximum allowable 3.5 specified. Based the investigation results, the contractor did remove and replace the top 50 mm hot-mix asphalt (HMA) overlay at his own expense. Although selection of proper tack...Keywords
This publication has 4 references indexed in Scilit:
- Effect of Bituminous Material Rheology on AdhesionTransportation Research Record: Journal of the Transportation Research Board, 2008
- Moisture Sensitivity of Modified Asphalt BindersTransportation Research Record: Journal of the Transportation Research Board, 2007
- Properties of Asphalt Concrete Layer InterfacesJournal of Materials in Civil Engineering, 2006
- Advanced Testing and Characterization of Interlayer Shear ResistanceTransportation Research Record: Journal of the Transportation Research Board, 2005