A new strategy of HVDC operation for maximizing renewable energy accommodation

Authors:

Abstract
Large scale renewable energy in northwestern area transported to eastern region by HVDC is of great significance to solve the problem of uneven distribution of renewable energy and load center in China. The flexible adjustment of HVDC can tap the cross-regional coordinative optimization potential of power resources and improve renewable energy accommodation. To this end, first of all, a strategy of HVDC multi-time scale coordinated operation is proposed in this article to determine base power and regulation region of HVDC at different time scale. Then, Taking day-ahead HVDC operation scheduling for example, a new mathematical model of HVDC tie-line operation optimization is developed with consideration given to the additional regulation cost of HVDC reactive power control devices and hydrothermal coordination optimization of receiving end grid to finally get HVDC base power for each plan period. Case studies are constructed to validate the effectiveness of the model and method.

This publication has 3 references indexed in Scilit: