Implementation of Process‐Based and Data‐Driven Models for Early Prediction of Construction Time
Open Access
- 23 January 2019
- journal article
- research article
- Published by Wiley in Advances in Civil Engineering
- Vol. 2019 (1)
Abstract
The need of respecting the construction time as one of the construction contract elements points out that early prediction of construction time is of crucial importance for the construction project participants’ business. Thus, having a model for early prediction of construction time is useful not only for the participants involved in the construction contracting process, but also for other participants in the construction project realization. Regarding that, this paper aims to present a hybrid method for predicting construction time in the early project phase, which is a combination of process‐based and data‐driven models. Five hybrid models have been developed, and the most accurate one was the BTC‐GRNN model, which uses Bromilow’s time‐cost (BTC) model as a process‐based model and the general regression neural network (GRNN) as a data‐driven model. For evaluating the quality of the models, the 10‐fold cross‐validation method has been used. The mean absolute percentage error (MAPE) of the BTC‐GRNN is 3.34% and the coefficient of determination R2, which reflects the global fit of the model, is 93.17%. These results show a drastic improvement of the accuracy in comparison to the model when only data‐driven model (GRNN) has been used, where MAPE was 31.8% and R2 was 75.64%. This model can be useful to the investors, the contractors, the project managers, and other project participants for construction time prediction in the early project phases, especially in the phases of bidding and contracting, when many factors, that can determine the construction project realization, are unknown.Keywords
Funding Information
- University of Rijeka (13.05.1.3.10)
This publication has 43 references indexed in Scilit:
- Process‐based models are required to manage ecological systems in a changing worldEcosphere, 2013
- Digital buildings – Challenges and opportunitiesAdvanced Engineering Informatics, 2011
- A distributed multi-model-based Management Information System for simulation and decision-making on construction projectsAdvanced Engineering Informatics, 2011
- Time–cost relationship of building projects: statistical adequacy of categorization with respect to project locationConstruction Management and Economics, 2011
- Combining semi-distributed process-based and data-driven models in flow simulation: a case study of the Meuse river basinHydrology and Earth System Sciences, 2009
- Application of a noisy data classification technique to determine the occurrence of flashover in compartment firesAdvanced Engineering Informatics, 2006
- The predictive ability of Bromilow's timecost modelConstruction Management and Economics, 2001
- Determinants of construction durationConstruction Management and Economics, 1995
- A general regression neural networkIEEE Transactions on Neural Networks, 1991
- On Estimation of a Probability Density Function and ModeThe Annals of Mathematical Statistics, 1962