Application study on integrated multi-objective optimization model of engineering project
Authors:
- 1 September 2009
- conference paper
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- Vol. 6 (21551847) , 290-296
Abstract
Time, cost, quality, and safety, with mutual influence, are the four major control items for project management. The best solution for a project is to achieve high quality with low cost in a proper time limit and without safe accident. Based on the comprehensive limitations above, an integrated optimization model is build up, which can balance the construction time-cost-quality-safety systematically in different risk level in order to archive the most satisfactory goals or several approximately perfect plans as alternatives. Through the optimizing the overall economic benefit of construction project is enhanced. Finally an instance, office building project, is carried out to show the validity of the model.Keywords
This publication has 6 references indexed in Scilit:
- A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lagsEuropean Journal of Operational Research, 2003
- Project Performance Control in Reconstruction ProjectsJournal of Construction Engineering and Management, 2000
- Time, cost and quality trade-off in project management: a case studyInternational Journal of Project Management, 1999
- Project management with time, cost, and quality considerationsEuropean Journal of Operational Research, 1996
- Resource Strategies for Dynamic Project ManagementJournal of Construction Engineering and Management, 1991
- Dynamic Programming for Project Cost-Time CurvesJournal of the Construction Division, 1967