FANPCE TECHNIQUE FOR RISK ASSESSMENT ON SUBWAY STATION CONSTRUCTION
Authors:
Open Access
- 3 June 2019
- journal article
- research article
- Published by Vilnius Gediminas Technical University in JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
- Vol. 25 (6) , 599-616
Abstract
Risk assessment is critical for the construction of the subway station to improve the risk management and reduce the additional loss. According to field investigation of safe construction, the analytical network process (ANP), fuzzy set theory and fuzzy comprehensive evaluation (FCE), a fuzzy ANP comprehensive evaluation (FANPCE) model was proposed to evaluate the risk of subway station construction in this paper. Twelve key risk factors of subway station construction were identified through literature review and questionnaires. The interdependency among risk factors were illustrated through the network structure of ANP, and then a weight matrix of single risk factors was built by comments and survey results, and the interdependent weight matrix was quantified by integrating the triangular fuzzy number into the ANP. Subsequently, the total risk rank of assessed projects can be quantified though the synthesis of weight matrices with the synthetic operator of FCE. Wu Lu Kou subway station was selected as a case study. The results imply that, construction experience, underground water, and safety consciousness have a substantial influence on construction projects and that the total construction risk of Wu Lu Kou subway station is ranked at I level. Moreover, the loss analysis of the whole construction process verifies this method. This research contributes to developing a FANPCE method to identify the risk factors with high weights, assess the risk rank of projects and appropriately respond to the results. In addition, the developed fuzzy set theory-ANP-FCE integrated network provides stakeholders a consolidated model for the risk evaluation.Keywords
This publication has 44 references indexed in Scilit:
- Risk matrix for factors affecting time delay in road construction projects: owners' perspectiveEngineering, Construction and Architectural Management, 2011
- Probabilistic risk assessment of highway tunnelsTunnelling and Underground Space Technology, 2011
- MULTIPLE CRITERIA CONSTRUCTION MANAGEMENT DECISIONS CONSIDERING RELATIONS BETWEEN CRITERIA / DAUGIATIKSLIAI STATYBOS VALDYMO SPRENDIMAI ATSIŽVELGIANT Į RODIKLIŲ TARPUSAVIO PRIKLAUSOMYBĘTechnological and Economic Development of Economy, 2010
- Risk assessment of international construction projects using the analytic network processCanadian Journal of Civil Engineering, 2009
- An Integrated Methodology for Assessment and Selection of the Project Risk Response ActionsRisk Analysis, 2009
- Use of analytic network process in vendor selection decisionsBenchmarking: An International Journal, 2006
- Design for durability including initiation and propagation period based on the fuzzy set theoryMaterials and Corrosion, 2006
- An analytic hierarchy process based model for risk and opportunity assessment of international construction projectsCanadian Journal of Civil Engineering, 2006
- A conceptual model for selecting and evaluating third‐party reverse logistics providersSupply Chain Management: An International Journal, 2002
- Project Risk Analysis Based on Prototype ActivitiesJournal of the Operational Research Society, 1994