Understanding the components and magnitude of the cost of quality in building construction
- 3 February 2021
- journal article
- research article
- Published by Emerald Publishing in Engineering, Construction and Architectural Management
- Vol. 29 (1) , 26-48
Abstract
Purpose: Though the components and concepts of cost of quality (COQ) are well understood in the domain of manufacturing, only limited data are available from the construction industry for various reasons. The present study seeks to establish a relationship between project defect score (pds), representing the quality of construction in the project, and the COQ in the building construction industry. The study also seeks to estimate the contributions of the various components to the overall COQ in the construction industry, along with their distribution and interrelationships among themselves.Design/methodology/approach: A framework for estimating COQ was developed, and the data regarding prevention, appraisal and failure cost were collected from 122 projects. Various mathematical and statistical tools like Pearson's correlation, multiple linear regression (MLR) and curve fitting have been used for data analysis.Findings: The prevention–appraisal–failure (PAF) model was found to be appropriate to estimate COQ, and the prevention, appraisal, conformance cost (CC) and failure cost were found to vary between 0.19 and 8%, 0.05 and 5%, 0.3 and 10% and 0.01 and 5%, respectively, whereas the overall COQ varied from 3.5 to 10.01% of the project cost. The correlations between various components of COQ were found to be significant. MLR suggested that appraisal cost is more impactful in reducing failure cost than prevention cost. Using curve fitting, the cubic model appropriately represented all interrelationships. The optimal overall COQ was found to be 3.86%, and the reasons for low COQ have been explored.Originality/value: The study evaluates the applicability of available models for COQ calculations for the construction industry and presents a framework to estimate its components. The study also explores the interrelationship between the various components of COQ and presents a generalized relationship between COQ and the pds.Keywords
This publication has 27 references indexed in Scilit:
- Distance factors and target market selection: the moderating effect of market potentialInternational Marketing Review, 2009
- Determinants of rework in building construction projectsEngineering, Construction and Architectural Management, 2004
- A project management quality cost information system for the construction industryInformation & Management, 2003
- A process approach in measuring quality costs of construction projects: model developmentConstruction Management and Economics, 2002
- Quantifying the causes and costs of rework in constructionConstruction Management and Economics, 2000
- The causes and costs of defects in constructionAutomation in Construction, 1999
- Using Opportunity Costs to Determine the Cost of Quality: A Case Study in a Continuous-Process IndustryThe Engineering Economist, 1998
- Developing a quality costing system: Key features and outcomesOmega, 1995
- Mapping quality assurance systems: A methodologyQuality and Reliability Engineering International, 1990
- LIMITATIONS ON THE USE OF THE MULTIPLE LINEAR REGRESSION MODELBritish Journal of Mathematical and Statistical Psychology, 1975