Abstract
This paper provides a comprehensive review of the Screening Robust Estimation Method (SREM) for normal processes in Phase I. Particular emphasis is placed on the exponentially weighted moving average (EWMA) control chart, which is employed in the retrospective monitoring stage. A central concern addressed in this discussion is that the EWMA chart is said to be based on the false alarm rate (FAR) design criterion, but it is accurately implemented. It is well established that FAR-based methods for Phase I monitoring assume that the distribution of the monitoring statistic remains invariant at each sampling instance. However, the EWMA statistic inherently introduces a sequential dependence among all sampling moments, which contradicts this assumption. This paper shows that a modified EWMA chart, incorporating probability-based control limits rather than the conventional formulation utilized in the SREM, enhances the monitoring of normal processes in Phase I. Through simulations, it is established that the new design proposal of an EWMA chart for Phase I monitoring has a slightly narrower decision threshold among the control methodologies included in the study. The new chart is as effective as the traditional X¯ charts in detecting localized increases in the target value of the mean of a normal process, and outperforms them when other types of anomalies are present in the available preliminary samples.
Funding Information
  • Universidad de Córdoba, Colombia

This publication has 25 references indexed in Scilit: