An integrative heuristic method for detailed operations scheduling in assembly job shop systems
- 17 January 2011
- journal article
- research article
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 49 (20) , 6089-6105
Abstract
In this paper, we describe a new heuristic method for simulating and supporting the operations scheduling process in assembly job shop systems. The method is based on the assumption that the improvement in operations synchronisation at fabrication and assembly stations brings forth better achievement of due dates. The method implements two scheduling approaches: a backward approach satisfying due date completely and a forward approach satisfying capacity restrictions completely. The two approaches work iteratively within two different simulation models of the production system – one deterministic and the other probabilistic – in searching for operations synchronisation improvement and due date achievement. The method intends to be integrative, i.e., to be able to integrate effectively three fundamental enterprise systems: order processing, production scheduling, and manufacturing activity control. An experimental study was conceived to evaluate the suitability of the method to support scheduling decision making. As results demonstrate, the method proves to be suitable for this objective. As a co-product, results show the method is better than the single-pass procedure/rules tested on average and is as good as the best single-pass procedure/rule tested.Keywords
This publication has 16 references indexed in Scilit:
- Performance evaluation of priority dispatching rules in multi-level assembly job shops with jobs having weights for flowtime and tardinessThe International Journal of Advanced Manufacturing Technology, 2006
- Dispatching rules for dynamic scheduling of one-of-a-kind productionInternational Journal of Computer Integrated Manufacturing, 2006
- Dispatching rules for production scheduling in the capital goods industryInternational Journal of Production Economics, 2006
- Scheduling rules for dynamic shops that manufacture multi-level jobsComputers & Industrial Engineering, 2003
- Experimental investigation of iterative simulation-based scheduling in a dynamic and stochastic job shopJournal of Manufacturing Systems, 2001
- The effects of product structure and sequencing rule on assembly shop performanceInternational Journal of Production Research, 1989
- Evaluating scheduling policies in a multi-level assembly systemInternational Journal of Production Research, 1986
- A comparative study of priority dispatching rules in a hybrid assembly/job shopInternational Journal of Production Research, 1984
- Complexity of Scheduling under Precedence ConstraintsOperations Research, 1978
- Multiple‐factor rules for sequencing with assembly constraintsNaval Research Logistics Quarterly, 1968