A branch-and-bound algorithm for three-machine flowshop scheduling problem to minimize total completion time with separate setup times
Authors:
- Ali AllahverdiAAAli Allahverdi
- Fawaz S. Al-AnziFAFawaz S. Al-Anzi
- 1 March 2006
- journal article
- Published by Elsevier in European Journal of Operational Research
- Vol. 169 (3) , 767-780
Abstract
No abstract availableThis publication has 22 references indexed in Scilit:
- Using two-machine flowshop with maximum lateness objective to model multimedia data objects scheduling problem for WWW applicationsComputers & Operations Research, 2002
- An improved branch-and-bound algorithm for the two machine total completion time flow shop problemEuropean Journal of Operational Research, 2002
- Minimizing mean flowtime in a two-machine flowshop with sequence-independent setup timesComputers & Operations Research, 2000
- A review of scheduling research involving setup considerationsOmega, 1999
- A Savings Index Heuristic Algorithm for Flowshop Scheduling with Sequence Dependent Set-up TimesJournal of the Operational Research Society, 1995
- Two-Stage Production Scheduling with Separated Set-up Times and Stochastic BreakdownsJournal of the Operational Research Society, 1995
- A branch-and-bound algorithm to minimize total tardiness with different release datesNaval Research Logistics (NRL), 1992
- Job lateness in a two-machine flowshop with setup times separatedComputers & Operations Research, 1991
- Improved lower bounds for minimizing the sum of completion times of n jobs over m machines in a flow shopEuropean Journal of Operational Research, 1990
- Scheduling tasks with sequence-dependent processing timesNaval Research Logistics (NRL), 1988