Multi-degree cyclic flow shop robotic cell scheduling problem with multiple robots
Authors:
- 25 July 2016
- journal article
- research article
- Published by Taylor & Francis in International Journal of Computer Integrated Manufacturing
- Vol. 30 (8) , 805-821
Abstract
This paper deals with the cyclic flow shop robotic cell scheduling problem with multiple robots, in which parts are processed successively on multiple machines with lower and upper bounds on processing times and the robots execute the transportation of parts between the machines. A novel mixed-integer linear programming model has been proposed for this problem. The proposed model simultaneously determines the optimal degree of the cyclic schedule and the optimal sequencing of the robots moves, which in return maximises the throughput rate. The validity of the proposed model is examined by a computational study on a set of randomly generated problem instances and solved using commercial optimisation software GAMS. The computational experiments indicate the efficiency of proposed model.Keywords
This publication has 32 references indexed in Scilit:
- An Improved Mixed Integer Programming Approach for Multi-Hoist Cyclic Scheduling ProblemIEEE Transactions on Automation Science and Engineering, 2013
- Scheduling multiple robots in a no-wait re-entrant robotic flowshopInternational Journal of Production Economics, 2012
- A polynomial algorithm for multi-robot 2-cyclic scheduling in a no-wait robotic cellComputers & Operations Research, 2011
- Multi-degree cyclic scheduling of a no-wait robotic cell with multiple robotsEuropean Journal of Operational Research, 2009
- Cyclic multiple-robot scheduling with time-window constraints using a critical path approachEuropean Journal of Operational Research, 2007
- Multi-Degree Cyclic Scheduling of Two Robots in a No-Wait FlowshopIEEE Transactions on Automation Science and Engineering, 2005
- Multicyclic hoist scheduling with constant processing timesIEEE Transactions on Robotics and Automation, 2002
- Cyclic scheduling in robotic flowshopsAnnals of Operations Research, 2000
- Scheduling no-wait robotic cells with two and three machinesEuropean Journal of Operational Research, 2000
- Cyclic scheduling of a hoist with time window constraintsIEEE Transactions on Robotics and Automation, 1998