A bottleneck-based heuristic for minimizing makespan in a flexible flow line with unrelated parallel machines
Author:
- Chuen-Lung ChenCCChuen-Lung Chen
- 1 November 2009
- journal article
- Published by Elsevier in Computers & Operations Research
- Vol. 36 (11) , 3073-3081
Abstract
No abstract availableThis publication has 48 references indexed in Scilit:
- Minimizing total tardiness of orders with reentrant lots in a hybrid flowshopInternational Journal of Production Research, 2005
- An immune algorithm approach to the scheduling of a flexible PCB flow shopThe International Journal of Advanced Manufacturing Technology, 2003
- A dispatching rule-based approach to production scheduling in a printed circuit board manufacturing systemJournal of the Operational Research Society, 2003
- An exact approach for batch scheduling in flexible flow lines with limited intermediate buffersMathematical and Computer Modelling, 2002
- SCHEDULING HYBRID FLOWSHOPS IN PRINTED CIRCUIT BOARD ASSEMBLY LINES*Production and Operations Management, 2002
- Scheduling of flexible flow lines in an automobile assembly plantEuropean Journal of Operational Research, 1997
- An adaptable problem-space-based search method for flexible flow line schedulingIIE Transactions, 1997
- Scheduling hybrid flowshops to minimize maximum tardiness or maximum completion timeInternational Journal of Production Research, 1996
- BPSS: A Scheduling Support System for the Packaging IndustryOperations Research, 1993
- An Adaptable Scheduling Algorithm for Flexible Flow LinesOperations Research, 1988