An artificial neural network (ANN) approach for early cost estimation of concrete bridge systems in developing countries: the case of Sri Lanka
Authors:
- 27 June 2023
- journal article
- research article
- Published by Emerald Publishing in Journal of Financial Management of Property and Construction
- Vol. 29 (1) , 23-51
Abstract
Purpose: The Government’s investment in infrastructure projects is considerably high, especially in bridge construction projects. Government authorities must establish an initial forecasted budget to have transparency in transactions. Early cost estimating is challenging for Quantity Surveyors due to incomplete project details at the initial stage and the unavailability of standard cost estimating techniques for bridge projects. To mitigate the difficulties in the traditional preliminary cost estimating methods, there is a requirement to develop a new initial cost estimating model which is accurate, user friendly and straightforward. The research was carried out in Sri Lanka, and this paper aims to develop the artificial neural network (ANN) model for an early cost estimate of concrete bridge systems. Design/methodology/approach: The construction cost data of 30 concrete bridge projects which are in Sri Lanka constructed within the past ten years were trained and tested to develop an ANN cost model. Backpropagation technique was used to identify the number of hidden layers, iteration and momentum for optimum neural network architectures. Findings: An ANN cost model was developed, furnishing the best result since it succeeded with around 90% validation accuracy. It created a cost estimation model for the public sector as an accurate, heuristic, flexible and efficient technique. Originality/value: The research contributes to the current body of knowledge by providing the most accurate early-stage cost estimate for the concrete bridge systems in Sri Lanka. In addition, the research findings would be helpful for stakeholders and policymakers to propose policy recommendations that positively influence the prediction of the most accurate cost estimate for concrete bridge construction projects in Sri Lanka and other developing countries.Keywords
This publication has 42 references indexed in Scilit:
- Effects of project’s physical characteristics on cost deviation in road constructionJournal of King Saud University – Engineering Sciences, 2013
- Cost escalation and schedule delays in road construction projects in ZambiaInternational Journal of Project Management, 2009
- Benchmarking in public procurementBenchmarking: An International Journal, 2008
- Parametric cost estimation based on activity-based costing: A case study for design and development of rotational partsInternational Journal of Production Economics, 2008
- A Cost Estimation Model for Repair Bridges Based on Artificial Neural NetworkAmerican Journal of Applied Sciences, 2008
- Comparison of construction cost estimating models based on regression analysis, neural networks, and case-based reasoningBuilding and Environment, 2004
- What Causes Cost Overrun in Transport Infrastructure Projects?Transport Reviews, 2004
- Underestimating Costs in Public Works Projects:Error or Lie?Journal of the American Planning Association, 2002
- Knowledge based-system for alternative design, cost estimating and schedulingKnowledge-Based Systems, 2002
- Neural network design for engineering applicationsComputers & Structures, 2001