Controllable production rates in a family production context
- 1 December 1991
- journal article
- research article
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 29 (12) , 2459-2470
Abstract
We consider a single facility dedicated to the production of a family of items where the policy used is to cycle production through the items every T units of time. This is known as the Common Cycle or Rotation Schedule and is a special case of the Economic Lot Scheduling Problem (ELSP). We consider the case in which the production rates can be reduced from known maximum rates. Moreover, we assume that production rates can be changed during the production runs. We optimally partition the items into those with high and low holding costs. The former are initially produced to meet demand while the latter are always produced at their maximum rates. Numerical examples indicate savings almost twice as large as those reported in the literature.Keywords
This publication has 9 references indexed in Scilit:
- Reduced production rates in the economic lot scheduling problemInternational Journal of Production Research, 1993
- Queueing-location problems on the planeNaval Research Logistics (NRL), 1990
- Scheduling the Production of Several Items with Random Demands in a Single FacilityManagement Science, 1990
- Deliberately slowing down output in a family production contextInternational Journal of Production Research, 1990
- The Effects of Varying Production Rates on Inventory ControlJournal of the Operational Research Society, 1989
- When Is The Economic Lot Scheduling Problem Easy?IIE Transactions, 1989
- The Economic Lot-Scheduling Problem: Achieving Feasibility Using Time-Varying Lot SizesOperations Research, 1987
- The Economic Lot Scheduling Problem (ELSP): Review and ExtensionsManagement Science, 1978
- A Dynamic Programming Approach to a Lot Size Scheduling ProblemManagement Science, 1966