Number of Development Wells: A Decision Under Uncertainty
Author:
- 25 November 2010
- journal article
- research article
- Published by Taylor & Francis in The Engineering Economist
- Vol. 55 (4) , 328-349
Abstract
Oil and gas companies are involved in the business of developing oil fields and bringing them into production for financial gain. One of the decisions made by field managers is determining the optimum number of wells in order to yield the highest net present value (NPV). This article reviews two approaches to solve this problem: deterministic and probabilistic. In addition, two methods are used for each approach: an analytical equation and a field development model. The need for a probabilistic approach to determine the optimum number of wells is essential because, in practice, decisions are made under uncertainties. A case study examining both vertical and horizontal wells is used in order to illustrate the approaches. Results showed that the horizontal well scenario yielded higher NPV than the vertical well scenario. The field development model validated the analytical equation method. The analytical equation method was found to be advantageous due to its ease in determining the probability of an event and its insights in determining which factors impact the optimum number of wells the most.Keywords
This publication has 5 references indexed in Scilit:
- Utility Efficient Frontier: An Application in the Oil and Gas IndustryNatural Resources Research, 2007
- Stochastic Oil Price Models: Comparison and ImpactThe Engineering Economist, 2007
- Valuing Flexibility in Offshore Petroleum ProjectsAnnals of Operations Research, 2000
- Brief: Risk Analysis and Monte Carlo Simulation Applied to the Generation of Drilling AFE EstimatesJournal of Petroleum Technology, 1995
- Development of a Well Spacing Program for the South Womack Hill Field, Clarke and Choctaw Counties, Alabama1986