Transition From Construction to Operation Phase of the Wendelstein 7-X Stellarator
- 20 February 2014
- journal article
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Plasma Science
- Vol. 42 (3) , 432-438
Abstract
Assembly of the superconducting stellarator Wendelstein 7-X is well advanced, and commissioning of the device is being prepared. A first draft of the commissioning tasks has been developed and will be discussed in this paper.Keywords
This publication has 15 references indexed in Scilit:
- Cutting edge concepts for control and data acquisition for Wendelstein 7-X2013
- The Trim Coils for the Wendelstein 7-X Magnet SystemIEEE Transactions on Applied Superconductivity, 2011
- Physics Programme for Initial Operation of Wendelstein 7‐XContributions to Plasma Physics, 2010
- The in-vessel components of the experiment WENDELSTEIN 7-XFusion Engineering and Design, 2009
- Structural analysis of W7-X: OverviewFusion Engineering and Design, 2009
- Stellarator WEGA as a test-bed for the WENDELSTEIN 7-X control system conceptsFusion Engineering and Design, 2008
- Manufacture and test of the non-planar coils for WENDELSTEIN 7-XFusion Engineering and Design, 2005
- Fabrication of the planar coils for WENDELSTEIN 7-XFusion Engineering and Design, 2005
- Control system of WENDELSTEIN 7-X experimentFusion Engineering and Design, 2003
- Detailed investigation of the vacuum magnetic surfaces on the W7-AS stellaratorNuclear Fusion, 1993