Abstract
The traditional power load forecasting learning method has problems such as overfitting and incomplete learning of time series information when dealing with complex nonlinear data, which affects the accuracy of short–medium term power load forecasting. A joint learning method, LSVM-MKL, was proposed based on the bidirectional promotion of deep kernel learning (DKL) and multiple kernel learning (MKL). The multi-kernel method was combined with the input layer, the highest coding layer, and the highest encoding layer to model the network of the stack autoencoder (SAE) to obtain more comprehensive information. At the same time, the deep kernel was integrated into the optimization training of Gaussian multi-kernel by means of the nonlinear product to form the nonlinear composite kernel. Through a large number of reference datasets and actual industrial data experiments, it was shown that compared with the Elman and LSTM-Seq2Seq methods, the proposed method achieved a higher prediction accuracy of 4.32%, which verified its adaptability to complex time-varying power load forecasting processes and greatly improved the accuracy of power load forecasting.
Funding Information
  • National Key Research and Development Program funding project (2022YFB3304800)

This publication has 14 references indexed in Scilit: