Abstract
Planning in the cold rolling is an increasingly important vital aspect in steel industry. In this study, we investigate a cold rolling planning problem derived from a steel company, which is characterized by multi-item considerations with sequence-dependent setups in a single period. To tackle this problem, we introduce a bi-objective modified lot-sizing model, aiming at minimizing both the capacity waste and setup cost. A dedicated multi-objective evolutionary algorithm is proposed to solve this problem. The experiment results demonstrate the effectiveness of the proposed algorithm in achieving near-optimal solutions within a reasonable time, which can facilitate reductions in both production costs and time.
Funding Information
  • The Major Program of National Natural Science Foundation of China (72192830, 72192831)
  • the 111 Project (B16009)