Bi-objective approach for lot-sizing problem in cold rolling production planning
Open Access
- 14 July 2024
- conference paper
- Published by Association for Computing Machinery (ACM)
- p. 99-100
Abstract
Planning in the cold rolling is an increasingly important vital aspect in steel industry. In this study, we investigate a cold rolling planning problem derived from a steel company, which is characterized by multi-item considerations with sequence-dependent setups in a single period. To tackle this problem, we introduce a bi-objective modified lot-sizing model, aiming at minimizing both the capacity waste and setup cost. A dedicated multi-objective evolutionary algorithm is proposed to solve this problem. The experiment results demonstrate the effectiveness of the proposed algorithm in achieving near-optimal solutions within a reasonable time, which can facilitate reductions in both production costs and time.Keywords
Funding Information
- The Major Program of National Natural Science Foundation of China (72192830, 72192831)
- the 111 Project (B16009)
This publication has 6 references indexed in Scilit:
- Scheduling of Continuous Annealing With a Multi-Objective Differential Evolution Algorithm Based on Deep Reinforcement LearningIEEE Transactions on Automation Science and Engineering, 2023
- The cold rolling mill scheduling problem: Some solution methodsComputers & Industrial Engineering, 2019
- An efficient optimal solution to the coil sequencing problem in electro-galvanizing lineComputers & Operations Research, 2010
- Production scheduling optimization algorithm for the hot rolling processesInternational Journal of Production Research, 2008
- A multi-sexual genetic algorithm for multiobjective optimization2002
- A fast and elitist multiobjective genetic algorithm: NSGA-IIIEEE Transactions on Evolutionary Computation, 2002