Minimum deviation algorithm for two-stageno-wait flowshops with parallel machines
Authors:
- Jinxing XieJXJinxing Xie
- Wenxun XingWXWenxun Xing
- Zhixin LiuZLZhixin Liu
- Jiefang DongJDJiefang Dong
- 1 June 2004
- journal article
- Published by Elsevier in Computers & Mathematics with Applications
- Vol. 47 (12) , 1857-1863
Abstract
No abstract availableKeywords
This publication has 11 references indexed in Scilit:
- Hybrid flow shop scheduling: A surveyComputers & Industrial Engineering, 1999
- A hybrid two-stage flowshop with part family, batch production, major and minor set-upsEuropean Journal of Operational Research, 1997
- A Survey of Machine Scheduling Problems with Blocking and No-Wait in ProcessOperations Research, 1996
- Performance of scheduling algorithms for no-wait flowshops with parallel machinesEuropean Journal of Operational Research, 1993
- Scheduling algorithms for flexible flowshops: Worst and average case performanceEuropean Journal of Operational Research, 1989
- An Adaptable Scheduling Algorithm for Flexible Flow LinesOperations Research, 1988
- Two-Stage, Hybrid Flowshop Scheduling ProblemJournal of the Operational Research Society, 1988
- Some no-wait shops scheduling problems: Complexity aspectEuropean Journal of Operational Research, 1986
- Sequencing a One State-Variable Machine: A Solvable Case of the Traveling Salesman ProblemOperations Research, 1964
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954