Reverse supply chain optimisation with disassembly line balancing
Authors:
- 3 June 2013
- journal article
- research article
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 51 (20) , 5985-6001
Abstract
Due to responding environmental issues, conforming governmental legislations and providing economic benefits, there has been a growing interest in recycling activities through the supply chains. Reverse supply chain (RSC) optimisation problem has a great potential as an efficient tactic to achieve this goal. While disassembly, one of the main activities in RSC, enables reuse and recycling of products and prevents the overuse, disassembly line balancing problem involves determination of a line design in which used products are partially/completely disassembled to obtain available components. The aim of this study is to optimise a RSC, involving customers, collection/disassembly centres and plants, that minimises the transportation costs while balancing the disassembly lines, which minimises the total fixed costs of opened workstations, simultaneously. A non-linear mixed-integer programming model, which simultaneously determines: (i) optimal distribution between the facilities with minimum cost, (ii) the number of disassembly workstations that will be opened with minimum cost, (iii) the cycle time in each disassembly centre and (iv) optimal assignment of tasks to workstations, is developed. A numerical example is given to illustrate the applicability of the proposed model. Different scenarios have been conducted to show the effects of sensitivity analyses on the performance measures of the problem.Keywords
This publication has 31 references indexed in Scilit:
- Operational and environmental performance measures in a multi-product closed-loop supply chainTransportation Research Part E: Logistics and Transportation Review, 2011
- A closed-loop supply chain network design problem with integrated forward and reverse channel decisionsIIE Transactions, 2010
- Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graphIIE Transactions, 2009
- Network model and optimization of reverse logistics by hybrid genetic algorithmComputers & Industrial Engineering, 2009
- Issues in reverse supply chain, part III: classification and simple analysisInternational Journal of Sustainable Engineering, 2009
- A heuristic approach to logistics network design for end-of-lease computer products recoveryTransportation Research Part E: Logistics and Transportation Review, 2008
- Profit-oriented disassembly-line balancingInternational Journal of Production Research, 2008
- Combinatorial optimization analysis of the unary NP-complete disassembly line balancing problemInternational Journal of Production Research, 2007
- A solution approach to the disassembly line balancing problem in the presence of task failuresInternational Journal of Production Research, 2001
- A closed-loop logistics model for remanufacturingJournal of the Operational Research Society, 1999