Abstract
With the development of modern economics, the dependence of socio-economic structure on electricity has grown increasingly pronounced. Consequently, the occurrence of large-scale power outages would result in substantial risks to public safety and economic losses. This study investigates the distributed black-start restoration strategy within the data center (DC) integrated power system. Recognizing the disparities in disaster response capabilities across various DCs, the study proposes a disaster restoration model of DCs accounting for differences in power supply levels. Furthermore, this study develops a linearized black-start restoration model of the power system in view of DC load adjustment. Lastly, this study presents a distributed optimization algorithm based on space exploration and unimodal region elimination for privacy protection between data center operators and the system operator. Simulation results verify the effectiveness of restoration coordination among generation sources, the grid, and loads. Besides, it is proven that the proposed distributed algorithm can effectively realize the maximal restored load on the premise of preserving the data privacy of each entity.
Funding Information
  • Smart Grid-National Science and Technology Major Project (2024ZD0802000)
  • Science and Technology Project of SGCC (52280024000L)

This publication has 42 references indexed in Scilit: