Jam in the Tunnel: On Urban Freight Tunnels, Their Operational Scheduling, and Unused Transport Capacity
- 1 September 2024
- journal article
- research article
- Published by Institute for Operations Research and the Management Sciences (INFORMS) in Service Science
- Vol. 16 (3) , 184-201
Abstract
Underground passageways for the transport of goods and people have fascinated mankind throughout the centuries. Recent initiatives in different parts of the world aim at rekindling the freight tunnel concept for urban logistics. According to this concept, freight is lifted into a tunnel, moved via electrically powered vehicles, rail cars, or maglev shuttles toward inner-city microhubs, and finally delivered with environmentally friendly vehicles to urban recipients. The main justification for this concept to outweigh the huge tunnel boring cost is a substantial reduction of road-based urban freight traffic. To warn about unfulfilled expectations, however, we show that the combination of time-critical goods, small inner-city hubs with restricted storage capacity, and the wrong booking procedure can hinder a loading of tunnel vehicles to capacity. To do so, we consider a polynomially solvable scheduling problem where due date-restricted shipments are to be assigned to tunnel vehicles and delivered to a given set of microhubs with limited storage capacity. Scarce hub capacities, tight due dates, and the wrong booking policy may not only lead to unused tunnel capacity but also to shipments that cannot be feasibly transported through the tunnel. If they are handed over to trucks as a fallback option, we show that a Braess-like paradox can occur: The time-critical, small-lot transports of the leftover shipments can produce even more surface traffic than trucking all shipments right from the start without the tunnel. Supplemental Material: The online appendices are available at https://doi.org/10.1287/serv.2023.0005 .Keywords
This publication has 39 references indexed in Scilit:
- Last-mile delivery concepts: a survey from an operational research perspectiveOR Spectrum, 2020
- Hybrid optimization procedures applying for two-echelon urban underground logistics network planning: A case study of BeijingComputers & Industrial Engineering, 2020
- A two-stage model for an urban underground container transportation plan problemComputers & Industrial Engineering, 2019
- A hybrid time MILP model for the pump scheduling of multi-product pipelines based on the rigorous description of the pipeline hydraulic loss changesComputers & Chemical Engineering, 2019
- Optimization approaches for civil applications of unmanned aerial vehicles (UAVs) or aerial drones: A surveyNetworks, 2018
- Just-in-time logistics for far-distant suppliers: scheduling truck departures from an intermediate cross-docking terminalOR Spectrum, 2017
- Optimization of a city logistics transportation system with mixed passengers and goodsEURO Journal on Transportation and Logistics, 2017
- A survey on networking games in telecommunicationsComputers & Operations Research, 2006
- Optimal scheduling of trains on a single line trackTransportation Research Part B: Methodological, 1996
- Special cases of traveling salesman and repairman problems with time windowsNetworks, 1992