Abstract
This paper addresses the problem of integrating in a single model operational optimization and cyclic scheduling of continuous plants. Considered are multiproduct, multistage plants with finite intermediate storage capacity (FIS). A combined optimization approach introduces synergic effects for more effective scheduling and plant operation (Alle and Pinto, 2001a,b). The representation proposed for this problem results in an MINLP model with a nonconvex feasible region and nonconvex objective function. In order to deal with nonconvexity, a spatial branch-and-bound global optimization algorithm is applied. Results show that the global approach is effectively able to yield more profitable solutions than those obtained by local optimization methods.

This publication has 11 references indexed in Scilit: