A discrete PSO for two-stage assembly scheduling problem
- 6 July 2012
- journal article
- research article
- Published by Springer Nature in The International Journal of Advanced Manufacturing Technology
- Vol. 66 (1-4) , 481-499
Abstract
No abstract availableKeywords
This publication has 22 references indexed in Scilit:
- Optimization of nonlinear geological structure mapping using hybrid neuro-genetic techniquesMathematical and Computer Modelling, 2011
- Transportation planning with modified S-curve membership functions using an interactive fuzzy multi-objective approachApplied Soft Computing, 2011
- Maximizing production rate and workload smoothing in assembly lines using particle swarm optimizationInternational Journal of Production Economics, 2011
- Cloud theory-based simulated annealing approach for scheduling in the two-stage assembly flowshopAdvances in Engineering Software, 2010
- Heuristics for a two-stage assembly flowshop with bicriteria of maximum lateness and makespanComputers & Operations Research, 2009
- A two-stage multiple-machine assembly scheduling problem for minimizing sum of completion timesInternational Journal of Production Economics, 2008
- A novel particle swarm optimization algorithm for permutation flow-shop scheduling to minimize makespan☆Chaos, Solitons & Fractals, 2008
- A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup timesEuropean Journal of Operational Research, 2007
- Soft-sensing of level of satisfaction in TOC product-mix decision heuristic using robust fuzzy-LPEuropean Journal of Operational Research, 2007
- A branch and bound algorithm to minimize the total weighted flowtime for the two-stage assembly scheduling problemComputers & Operations Research, 2003