Energy Harvesting and Communication Systems for Power Lines Inspection Robot
Authors:
- 19 October 2020
- conference paper
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-4
Abstract
For an autonomic power lines inspection robot the energy harvesting system and communication systems are being developed. In this paper the energy harvesting based on toroidal split core current transformer is described. The maximal output power is depend on the current in power line, the transformer core geometry and other factors. The results from the testing and measuring of the current transformer are presented. Also the structure of the communication system is described.Keywords
Funding Information
- Technology Agency of the Czech Republic (TH02020319,SGS-2018-001)
This publication has 6 references indexed in Scilit:
- Study on Power Supply System by Using CT in High-Voltage Transmission LinesResearch Journal of Applied Sciences, Engineering and Technology, 2013
- Research on electric energy harvesting from high-voltage transmission line2013
- Design and Analysis of Multi-Winding Power Current Transformer for Power Transmission Lines Inspection RobotProcedia Engineering, 2012
- Design of Current Transformer for Power Transmission Lines Inspection Robot2011
- Research on Self-Power Supply System of Inspection Robot for High-Voltage Power Transmission Lines2010
- Design considerations for current transformer based energy harvesting for electronics attached to electric motor2008