Sensitivity of mean transit time estimates to model conditioning and data availability
- 9 February 2011
- journal article
- scientific briefing
- Published by Wiley in Hydrological Processes
- Vol. 25 (6) , 980-990
Abstract
Mean transit times (MTTs) can give useful insights into the internal processes of hydrological systems. However, varying model conditioning assumptions and data availability can limit the use of MTT, particularly in terms of comparing the results of studies using different assumptions and data records of varying lengths. We present a systematic analysis of sensitivity of MTT estimates to different methods of artificially extending the data record, varying model warm‐up period lengths and varying sampling intervals for a small upland catchment in the Scottish Highlands. The analysis was based on Cl−data in conjunction with the convolution integral model using the gamma distribution as transit time distribution. It could be shown that three out of four different methods to artificially extend the data record and to generate a warm‐up period give mostly equivalent results. The required minimum warm‐up period length to reliably estimate MTT for a 3‐year period of data was observed to be about 2 years or 3 times the MTT, implying that ∼95% of the tracer signal entering the stream at day 1 of the warm‐up period has to be recovered by the end of the warm‐up period in order to avoid significant deviations from the best available MTT estimates. It was furthermore found that sampling intervals of up to 4 weeks can produce MTT estimates within about 0·25 times the best available MTT estimate, albeit with potentially increased process misrepresentation in terms of the gamma distribution parameter α. Copyright © 2011 John Wiley & Sons, Ltd.Keywords
This publication has 38 references indexed in Scilit:
- Generality of fractal 1/f scaling in catchment tracer time series, and its implications for catchment travel time distributionsHydrological Processes, 2010
- Transit time distributions of a conceptual model: their characteristics and sensitivitiesHydrological Processes, 2010
- Towards a simple dynamic process conceptualization in rainfall–runoff models using multi‐criteria calibration and tracers in temperate, upland catchmentsHydrological Processes, 2009
- Assessing the added value of high-resolution isotope tracer data in rainfall-runoff modellingEGUsphere, 2009
- Learning from model improvement: On the contribution of complementary data to process understandingWater Resources Research, 2008
- Conceptualization in catchment modelling: simply learning?Hydrological Processes, 2008
- Understanding catchment behavior through stepwise model concept improvementWater Resources Research, 2008
- Multi-period and multi-criteria model conditioning to reduce prediction uncertainty in an application of TOPMODEL within the GLUE frameworkJournal of Hydrology, 2007
- Bayesian Estimation of Uncertainty in Runoff Prediction and the Value of Data: An Application of the GLUE ApproachWater Resources Research, 1996
- The future of distributed models: Model calibration and uncertainty predictionHydrological Processes, 1992