Scaling Analysis of Pier-Scouring Processes
- 1 August 2016
- journal article
- Published by American Society of Civil Engineers (ASCE) in Journal of Engineering Mechanics
- Vol. 142 (8)
Abstract
This study presents a scaling analysis of the time development of clear-water scour depth at bridge piers. It shows that the widely-used exponential formula can be theoretically derived with scaling arguments. The derivation provides connections between the physical pier-scouring process and two empirical constants used in the formula. The dependence of the two constants on sediment coarseness is calibrated using published laboratory data with scour duration ranging from 49 to 1094 h. The analysis presented is restricted to conditions, including steady flow, clear-water scour, narrow circular cylindrical pier, and uniform sediment with low coarseness.Keywords
This publication has 10 references indexed in Scilit:
- Effect of Sediment Size Scaling on Physical Modeling of Bridge Pier ScourJournal of Hydraulic Engineering, 2009
- Characteristics of developing scour-holes at a sand-embedded cylinderInternational Journal of Sediment Research, 2008
- Exponential expression for time evolution in local scourJournal of Hydraulic Research, 2004
- Temporal Evolution of Clear-Water Pier and Abutment ScourJournal of Hydraulic Engineering, 2002
- The Mechanics of Scour in the Marine Environment2002
- Time Scale for Local Scour at Bridge PiersJournal of Hydraulic Engineering, 1999
- Scale Effect in Pier-Scour ExperimentsJournal of Hydraulic Engineering, 1998
- Prediction of Maximum Scour Depth at Submarine PipelinesJournal of Hydraulic Engineering, 1991
- Scour at Cylindrical Bridge Piers in Armored BedsJournal of Hydraulic Engineering, 1985
- Local Scour Around Cylindrical PiersJournal of Hydraulic Research, 1977