Bridging the Gap between High and Low-volume Production through Enhancement of Integrative Capabilities
Authors:
- Elisabeth Lervåg SynnesESElisabeth Lervåg Synnes
- Torgeir WeloTWTorgeir Welo
Open Access
- 1 January 2016
- journal article
- Published by Elsevier in Procedia Manufacturing
- Vol. 5, 26-40
Abstract
No abstract availableKeywords
This publication has 26 references indexed in Scilit:
- Project-driven Concurrent Product DevelopmentConcurrent Engineering, 2009
- Managerial issues in modularising complex productsTechnovation, 2006
- A methodology for integrated product development using design and manufacturing templatesJournal of Manufacturing Technology Management, 2006
- The Toyota Way in Services: The Case of Lean Product DevelopmentAcademy of Management Perspectives, 2006
- Problems in concurrent new product development: an in‐depth comparative study of three companiesIntegrated Manufacturing Systems, 2003
- On customer value and improvement in product development processesSystems Engineering, 2003
- Design for manufactureJournal of Materials Processing Technology, 2002
- Design for manufacture and design for ‘X’: concepts, applications, and perspectivesComputers & Industrial Engineering, 2001
- Rapid product development — an overviewComputers in Industry, 2000
- Applying lean principles for high product variety and low volumes: some issues and propositionsLogistics Information Management, 1997