NWP Grid Editing at the Met Office
Authors:
Open Access
- 1 December 2005
- journal article
- Published by American Meteorological Society in Weather and Forecasting
- Vol. 20 (6) , 1021-1033
Abstract
Over the past few years the way in which central forecast guidance is disseminated by forecasters in the Met Office headquarters has been changing, with an increasing reliance on modification of variables’ output from NWP models. The editing of grids of forecast data at the Met Office Operations Centre in Exeter is described, and two case studies are presented. Results of verification of modified versus raw fields are shown, presenting the concept of “lead time gain” as a unifying measure of relative forecast accuracy. At all lead times net lead time gain outweighs time spent considering and effecting modifications.Keywords
This publication has 5 references indexed in Scilit:
- Comments on “Discussion of Verification Concepts in Forecast Verification: A Practitioner’s Guide in Atmospheric Science”Weather and Forecasting, 2005
- Use of medium‐range ensembles at the Met Office 2: Applications for medium‐range forecastingMeteorological Applications, 2002
- Verification of precipitation in weather systems: determination of systematic errorsJournal of Hydrology, 2000
- A technique for consistent alteration of NWP output fieldsMeteorological Applications, 1997
- An Overview of Numerical Methods for the Next Generation U.K. NWP and Climate ModelAtmosphere-Ocean, 1997