On the pointlessness of machine learning based time delayed prediction of TBM operational data
Authors:
- Georg H. ErharterGEGeorg H. Erharter
- Thomas MarcherTMThomas Marcher
Open Access
- 1 January 2021
- journal article
- research article
- Published by Elsevier in Automation in Construction
- Vol. 121
Abstract
No abstract availableKeywords
This publication has 30 references indexed in Scilit:
- Applying radial basis function neural networks to estimate next-cycle production rates in tunnelling constructionTunnelling and Underground Space Technology, 2010
- One-Day Wave Forecasts Based on Artificial Neural NetworksJournal of Atmospheric and Oceanic Technology, 2006
- Constraints of artificial neural networks for rainfall-runoff modelling: trade-offs in hydrological state representation and model evaluationHydrology and Earth System Sciences, 2005
- Framewise phoneme classification with bidirectional LSTM and other neural network architecturesNeural Networks, 2005
- A two‐step‐ahead recurrent neural network for stream‐flow forecastingHydrological Processes, 2003
- Delayed time series predictions with neural networksNeurocomputing, 1998
- Long Short-Term MemoryNeural Computation, 1997
- Effect of data standardization on neural network trainingOmega, 1996
- Neural network prediction of solar activityThe Astrophysical Journal, 1995
- Engineering classification of rock masses for the design of tunnel supportRock Mechanics and Rock Engineering, 1974